Optimal scheduling for a multiproduct batch process with minimization of penalty on due date period
SCIE
SCOPUS
- Title
- Optimal scheduling for a multiproduct batch process with minimization of penalty on due date period
- Authors
- Ryu, JH; Le, HK; Lee, IB
- Date Issued
- 2001-01-10
- Publisher
- AMER CHEMICAL SOC
- Abstract
- To make scheduling problems more realistic, we develop a new scheduling model with penalty functions for earliness and tardiness. Instead of a fixed due date, the scheduling problem is approached by taking the due date as a time period, which can handle flexible due dates and flexible customer requirements with penalty parameter modifications. We solve this optimization problem by the simulated annealing method and demonstrate its effectiveness with three examples.
- Keywords
- TARDINESS PENALTIES
- URI
- https://oasis.postech.ac.kr/handle/2014.oak/19726
- DOI
- 10.1021/ie000375t
- ISSN
- 0888-5885
- Article Type
- Article
- Citation
- INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, vol. 40, no. 1, page. 228 - 233, 2001-01-10
- Files in This Item:
- There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.