Open Access System for Information Sharing

Login Library

 

Article
Cited 20 time in webofscience Cited 0 time in scopus
Metadata Downloads

Scheduling of single-stage and continuous processes on parallel lines with intermediate due dates SCIE SCOPUS

Title
Scheduling of single-stage and continuous processes on parallel lines with intermediate due dates
Authors
Lee, KHHeo, SKLee, HKLee, IB
Date Issued
2002-01-09
Publisher
AMER CHEMICAL SOC
Abstract
This paper addresses scheduling problems in single-stage and continuous multiproduct processes on parallel lines with intermediate due dates and especially restrictions on minimum run lengths. Whereas previous approaches require predetermined time slots or a maximum number of time slots to which only one task should be assigned, the proposed formulation does not use time slots within a time period. Therefore, the size of a model and its computation time are significantly reduced, with restrictions on several realistic situations, such as minimum run lengths, idle times of processes, and tests/maintenance, that are addressed in previous literature. Our approach is illustrated with various examples presented in the literature.
Keywords
CONTINUOUS-TIME FORMULATION; SEMICONTINUOUS PROCESSES
URI
https://oasis.postech.ac.kr/handle/2014.oak/19239
DOI
10.1021/IE010097D
ISSN
0888-5885
Article Type
Article
Citation
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, vol. 41, no. 1, page. 58 - 66, 2002-01-09
Files in This Item:
There are no files associated with this item.

qr_code

  • mendeley

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

Related Researcher

Researcher

이인범LEE, IN BEUM
Dept. of Chemical Enginrg
Read more

Views & Downloads

Browse